Meet With Us
18
Jan
19
Projecting out to the rear can sometimes be a little tricky from a planning perspective, but this is exactly the planning gain we managed to achieve for our client in Acton, W3. The structure required some complex structural engineering, and the fabrication of a cranked steel beam to tie the rear facade with the side return.